The challenge
Melt decisions depended on results that could not always be tied back to the sample and the process stage.

Our solution
Sample identity, preparation and measurement record kept together on an Innovate T5, with its three-side open excitation stage used for awkward sample shapes.

The result
3 min sample-to-result time; 12 elements reported; 1 record per melt sample.

Project notes
The setting
A foundry in Southeast Asia needed a clearer way to connect composition checks with its melt review. Samples reached the testing area from different process stages, and the production team wanted the resulting records to be easier to trace back to the material being discussed.
The challenge
The main challenge was consistency across the sequence. Sample identity, surface preparation and the selected material programme all needed to be recorded together. The team also needed a way to separate a measurement from the decision to continue a process or investigate a difference.
The proposed approach
The demonstration workflow uses an Innovate T5 as the instrument named in the evaluation. Its suitability is assessed against representative samples and an agreed configuration. The workflow starts with a sample identity, follows the approved preparation procedure and records the measurement conditions with the result.
The laboratory and production team agree how to review unexpected readings. Original results remain in the record when a repeat is needed. The reason for repeating preparation or measurement is recorded so that later reviewers can follow the sequence.
The result
The scenario ends with a more structured handover: each reviewed sample is connected to its preparation record and result, and unresolved observations remain visible. The qualitative outcome is clearer communication between the testing area and the production team, rather than a claimed increase in output or instrument performance.
What carries over to another foundry
The approach depends on the material, sampling procedure and decision rules used by the next site. Those conditions should be reviewed independently. A similar task begins with representative material and a technical evaluation plan.